LAGUREN.NET
  • HOME
  • About Me

Continuous Performance Testing

3/2/2014

 
After the need for healthcare brought down the Obamacare website (www.healthcare.gov), it can be easily stated that performance testing plays a critical role in the software development life cycle (SDLC).  Companies cannot afford to put performance testing activities towards the end of their development pipeline.  Automated regression testing has slowly been making its way to the head of the class due to agile development best practices.  Why does performance testing still hide in the back?

The feature being developed is not ready for performance testing

Even if the feature has not been fully developed, a lot goes into planning and making sure that the right tests are being defined.  If development is being tracked with a Kanban board, get in the practice of adding a performance testing story that can be worked on every sprint.  With continuous integration becoming a standard practice, try to design the stories so that they become part of your CI process.

The infrastructure is not ready to do load testing

With many cloud services offering solutions for performance testing, such services can be used to execute small load testing tests against the application being developed.  In some cases, such services may actually be cheaper than hosting an internal infrastructure to perform the load testing.  

There isn't budget for performance testing tools

The open source community has developed mature tools for performance testing.  Even enterprise companies have developed free or community edition of their software for performance testing.  At this point, the only cost is the time spent by an engineer to learn how to use the tools and apply it to everyday work.  For the same free open source tools, there are exponentially more videos on the internet that show you how to use them.

So what is stopping organizations from moving to a more agile approach to performance testing?  The industry has made advancements in bringing functional testing "up the waterfall" with automation.  The same can be true with performance testing.

Calabash Workshop In The Works

10/17/2013

 
Based on the interest from the first QA Craftsmanship Meetup, I have put together a survey to see the interest in having a hands on workshop.  If interested, please fill out the following survey:  http://www.surveymonkey.com/s/VWHM7CV

Learn How Althea Uses Calabash Presentation

10/10/2013

 
Yesterday was the first Meetup for the QA Craftsmanship group and the third for the Mobile Testing Gurus.  Below is the Prezi that was used to kick off the event and thanks to Michael Larsen for his incredible live blogging.  Stay tune for SQA Essentials workshop on Calabash.   Finally, checkout Mishal Shah's blog to learn how to install calabash on your mac.
<<Previous

    RSS Feed

    Categories

    All
    Advice
    Agile
    Android
    Automation
    BDD
    C9D9
    Capybara
    Career
    Continuous Delivery
    Continuous Integration
    Cucumber
    Database
    Ebates
    Firefox
    Fiverr
    GIT
    Groupon
    Interview
    Investing
    Jenkins
    JIRA
    Jmeter
    Jobs
    Meetup
    Melvinisms
    Metaprogramming
    Mobile
    Ruby
    Stockpile
    Training

© COPYRIGHT 2018. ALL RIGHTS RESERVED.
  • HOME
  • About Me